|||
Not Registered
Go AD FREE & get your membership medal
BRONZE
Less Ads
SILVER
GOLD
Ad Free
Cancel
Anytime
ยฃ2.50
ยฃ4.50
ยฃ6.50
Subscribe
Go AD FREE & get your membership medal
BRONZE
Less Ads
SILVER
GOLD
Ad Free
For A Whole Year!
ยฃ25
ยฃ45
ยฃ65
Donate
You Will Be Helping Towards:

  • Domain Fees
  • Security Certificates
  • iOS & Android App Fees
  • Website Hosting
  • Fast Servers
  • Data Backups
  • Upkeep & Maintenance
  • Administration Costs

    Without your support the website wouldn't be what it is today.

    Please consider donating towards these fees to help keep us afloat.

    Read more

    All donations are securely managed through PayPal.

    Many thanks for your kind support
  • Join Us On Social Media!
    Download The App!

    Login To
    Remove Ads
    Login To
    Remove Ads

    Model Boats Website
    Model Boats Website
    Home
    Forum
    Build Blogs
    Media Gallery
    Boat Clubs & Lakes
    Events
    Boat Harbour
    How-To Articles
    Plans & Docs
    Useful Links
    Search
    Search
    Blog
    Fire Monitors Part 2
    Some thought has to be given how to hold all these remaining parts, firstly I need to make sure that I can replicate an upward incline since there wonโ€™t be any up and down movement, only rotation. Here comes another jig, a simple block of ยฝ inch hardwood with the angle cut at 200 and the corner removed to allow all the soldering to take place. Carefully marking out a centre line I used small brass pins to hold the pre silver soldered pipes in position on the flat sides. I now used some clamps to hold the brass pipes in place, check all the alignments then flux is applied. Very gently apply the heat with a soldering iron until the solder flows, itโ€™s important to tack both ends of each pipe first on each side as at this stage the set-up is delicate to say the least and can be dislodged very easily. Then follow round to complete the joints making sure you donโ€™t overheat the whole assembly and melting the parts already soldered. Next I need to test for leakage, if all OK I can carry on to fettle the joints, I donโ€™t use files or abrasive paper to do this I only use a scalpel to remove any excess solder itโ€™s so easy and better results are achieved. This also applies to cleaning up the white metal fittings; the main posts need to have a better base with some sort of fastening arrangement made, so an aluminium piece is machined up with three holes for fastening to the roof, this was then epoxied to the main post. The next job is to make the handles, for this I used some 3mm plate which I cut some slices off with a slitting saw. In its raw state it is hard and needs annealing before bending. The pieces were all cut to length and then drilled in a jig to ensure all the pieces were exactly the same, I can now leave a drill in both the end holes which keeps the pieces together while they are placed in the machine vice with a piece of round bar at the back to give a nice radius. The handles need a cross bar with โ€œknobs onโ€ so a little bit of machining and then the assembly can be done. The handles are soft soldered in place at the correct distance; I now need to drill and tap 10 BA the main
    body pipes
    to hold the handles in place. When these are assembled they will be put together with some epoxy on the screws and between the faces. Whilst using the epoxy I can glue the white metal exit pipe in place, this now completes the assembly. Next a coat of etch primer followed by a coat of grey primer then finally bright red, these will be left to fully dry before I attempt looking at the rotary system
    5 years ago by mturpin013


    About This Website
    Terms of Service
    Privacy Policy