Evidently the order was placed in July for Waverley's new boilers and after an extensive design phase, both boilers are being built by Cochrans in Annan. Also, three new electric generators have been built, tested and ready for despatch.
Looks very much as if we will see Waverley back in operation during the summer of 2020.