Latest from the gallery

1 post
topperles
Master Seaman
1 / 4
Sir Key
Just finished this over Christmas. All lights work ,the deck is done with timber strips. just to rig up rc.
All the rigging detaches from the masts so I can gain access to the battery n the running gear. Lashings of Lead used as ballast. Talk about top heavy.......
Think I will weather her and get her smoking .....later
Liked by fact77 and Northumbrian

Liked by

Loading…

Delete this post?

It will be removed from the site.

Discard this draft?

Your draft will be deleted and cannot be recovered.

You have an unfinished draft

What would you like to do with it?