Forceful Directors Class Paddle tug

By Kevin55 58 entries 28 Feb 2026 — 15 Oct 2026
401Likes
63Comments
Chapter 11 / 58

58 chapters · Page 2 of 6

Kevin55 #11 of 58 135

Rudder update

Second part of the rudder in its final stages before making the rudder stock and bearing sleeve.

The bearing sleeve is to have a shaft seal to stop the water from entering.

Bearing stub arbours added today

More soon..
Liked by chugalone100 and Steve P and
Kevin55 #13 of 58 135

Rudder 1st fit

Rudder stock made and fitted to rudder and installed to check alignment.
All ok…
Liked by tomarack and RNinMunich and
Kevin55 #16 of 58 135

Fire monitor water intake

Not sure what’s the norm as a water intake so I just made something I thought looked ok. Stainless mesh to prevent to may bits blocking the copper tube ….
Liked by pressonreguardless and GaryLC and
Kevin55 #17 of 58 135

Steam formed bulwark bow and stern

First job was to make the steam box and formers.
Then onto the forming of the bow and stern bulwark sections. Straight sections made too.
All parts bonded on to the hull and trimmed
Liked by SimpleSailor and pressonreguardless and
Kevin55 #18 of 58 135

Decking started

Additional temporary beams added for camber on access areas
Stringers installed and birch plywood deck underway
Liked by Ronald and SimpleSailor and
Kevin55 #19 of 58 135

Finally finished the birch plywood sub deck

Fore Deck and walkways ready for planking when adhesive has cured.
Pin holes drilled via a clear plastic template prior to installation.
Liked by Ronald and SimpleSailor and
Kevin55 #20 of 58 135

Walnut margin planks and king plank

Walnut margin and king planks installed
Next fill pin hole with walnut dust and glue
Sand flush when dry
Installation of main deck and chalking next
Liked by stevedownunder and Ronald and

Delete this post?

It will be removed from the site.

Discard this draft?

Your draft will be deleted and cannot be recovered.

You have an unfinished draft

What would you like to do with it?