USS Juneau
The rudder post goes up thru the keel and thru 1 1/2"s of maple block, all bedded with thickened epoxy. I still need to coat the outside of the blocks.
Atlantas had prop shafts that were just shy of two feet in diameter. That would be about 1/2", mine are .275", so I added metric tubing to make the shaft diameter more realistic appearing. It free floats on the shafts. I added Oilite thrust washers to each end of the shafts as well. My shafts are too short, so I bought new lenghts and they are being threaded for the props, which have been cross drilled and tapped. Stainless set screws complete them.
The deck beams that the hull was built with do not conform with the hull. I had laser cut beams made with the proper camber. After trimming the existing beams, they are sandwiched between two new beams and all will be epoxied together. The strips running the center line of the deck help me to align the camber center line and are temporary. When all are fitted and aligned the glue mixing begins.
That's all for now.