Still very much in the early stages of construction.
Most of the internal workings are in place ,but still a few ideas to work on.
Thus far she has a working forward aircraft lift.
A smoke generator (water not oil).
All four rear guns rotate.
A working bilge pump.
Working next on how to activate the crane.
All three engines are powered from a 6 volt battery.
All other items mentioned above powered from another 6 volt battery,bot of which provide the main ballast.
As I say still a long way to go yet as can be seen.Many of the fittings have to be more authentically painted.
- gordywill🇬🇧RecruitThat,s a lovely bit of work!Like
- jbkiwi🇳🇿Fleet AdmiralLooking great so far !Like 1Liked by Scratchbuilder